Almost every UK site asks contractors for RAMS before the first day, yet the term is rarely defined and the quality varies enormously. This article sets out what RAMS is, what a usable one contains, and how to review it in a few minutes so it protects people and not just your paperwork.
What RAMS means
RAMS stands for risk assessment and method statement. It is one document, or a pair, that answers two questions about a piece of work: what could go wrong and how will it be controlled (the risk assessment), and in what order will the work be done and by whom (the method statement).
RAMS is a working term used across construction, facilities and maintenance, not a defined legal one. The duties underneath it are legal. Employers must assess the risks of their work under the Management of Health and Safety at Work Regulations 1999, and construction projects add planning and coordination duties under the Construction (Design and Management) Regulations 2015, including a construction phase plan led by the principal contractor.
In practice, clients and principal contractors ask for RAMS as the evidence that a contractor has thought about the task before starting it. That makes the quality of the document the point, and not the fact that one exists.
What a usable RAMS contains
Adapt this to the work. A short, specific document is worth more than a long generic one.
Risk assessment
- The task and the location, named specifically
- The hazards the task creates or meets, such as work at height, electricity, moving plant or hazardous substances
- Who could be harmed: the crew, other trades, the public, building occupants
- The controls in place, and how risk remains after them
- Who assessed it, the date and the version
Method statement
- The sequence of work, step by step
- The team, their roles and their competence for the task
- Plant, tools and access equipment to be used, with inspection status
- Personal protective equipment required
- Permits needed, for example hot work or confined space entry
- Emergency arrangements, including first aid and rescue
- Welfare and site rules that apply, such as access routes and working hours
Sign-off
- Approval by a competent person on the contractor's side
- Review by the client or principal contractor
- A briefing record showing each operative has read and understood it
What to check when a RAMS arrives
You do not need to be a health and safety professional to catch the common problems. Ask these questions.
Is it specific?
Does it name the site, the task and the date range? Does the sequence match what will really happen?
Is it current?
Is it dated, versioned and signed? A RAMS from last year's job is a template, not a plan.
Does it match the people?
Are the named operatives the ones arriving, and do they hold the cards or certificates the task needs?
Does it fit your site rules?
Access, permits, working hours, noise limits and any client requirements should be reflected.
Has it reached the crew?
Is there a record that each operative has been briefed, and will it be reviewed if the work changes?
RAMS and the rest of your contractor records
A RAMS is one of several documents that decide whether a contractor starts. It sits beside insurance, competence cards such as CSCS, right to work checks and training certificates, and it has a different life cycle: instead of a printed expiry, it belongs to a job, and should be reviewed when the task, the site or the team changes.
That is easy to lose in a shared folder. Treat it as a requirement with its own review period, and track it with the same discipline as the documents that do expire. The UK contractor compliance guide covers the full document set, and the contractor onboarding checklist lists what to collect before work starts.
How AuditSci helps you keep RAMS under control
AuditSci stores the document, tracks its review date and records who accepted it. It does not assess whether a RAMS is technically adequate: that remains a competent person's decision.
- RAMS as a requirement. Add it to the contractor's approval category, with a review period that suits the work, for example twelve months for repeat tasks.
- Sent by the contractor's contact. The company's authorised contact receives a personal link by email and uploads the document. No app or account.
- A reviewer decides. A person on your team checks the document against the checklist above and approves or rejects it. The decision is recorded with author, date and time.
- A reminder before the review date. You choose how early the renewal opens, and the item appears in the queue with a deadline.
Frequently asked questions
Is RAMS a legal requirement?
No law requires a document called RAMS. The law requires risk assessment, and on construction projects it adds planning and coordination duties under the CDM Regulations 2015. Clients and principal contractors ask for RAMS as the usual way of evidencing that work has been planned. Confirm what applies to you with a competent adviser.
Who writes the RAMS?
The contractor doing the work, because it is their method and their risks. The client or principal contractor then reviews it against the site and the project. A document written by the client for the contractor is not a substitute.
How long is a RAMS valid for?
There is no fixed period. A RAMS belongs to a specific task and site, and should be reviewed when the work, the location, the equipment or the team changes. For repeat work, many organisations set a periodic review, such as annually.
Are RAMS and a construction phase plan the same?
No. A construction phase plan is a project-level document that the principal contractor prepares under CDM 2015. RAMS are usually task-level documents from each contractor, and they should fit within the plan.
Can a template RAMS be used?
A template can be a starting point, but it must be edited to the actual site, task and team. A template used without adaptation is the most common reason a RAMS fails review.
Does AuditSci check if a RAMS is adequate?
No. AuditSci holds the document, tracks its review date, and records who reviewed and accepted it. Judging whether the content is adequate is a decision for a competent person on your team.
AuditSci